Industrial Rooftop Solar in Noida, Greater Noida – Save β‚Ή5–₹50 Lakhs Every Year on Electricity

Reduce your factory’s power cost by up to 90% with end-to-end Industrial RooftopΒ Solar SolutionsΒ in Noida, Greater Noida, Ghaziabad & Delhi NCR.

  • Payback in 3–4 Years
  • EMI Available – No Upfront Burden

πŸ‘‰ Electricity rates increasing 5–8% every year β€” lock your cost with solar today.

Calculate Your Factory’s Solar Savings in 30 Seconds

Enter your monthly electricity bill and see how much you can save with solar.

Calculate Your Factory Solar Savings




Financing Inputs

Why Industries Are Switching To Rooftop Solar

Why Factory Owners in Noida Are Rapidly Adopting Solar, because:

πŸ”΄ Rising Electricity Costs
Grid tariffs increasing every year

πŸ”΄ Diesel Generator Expense
β‚Ή20–₹25 per unit vs β‚Ή3–₹5 solar cost

🟒 Solar = Fixed Energy Cost
No inflation, no surprises

🟒 Improves Profit Margins
Direct impact on bottom line

🟒 ESG & Compliance Benefits
Better brand image & approvals

For manufacturing plants, electricity is one of the largest operational expenses. Instead of paying increasing grid charges, industrial rooftops can generate long-term, stable power through solar installations.

Why Industrial Rooftop Solar Makes Financial Sense

β€’ 3–4 Year Payback Period
β€’ 20–25 Years of Savings
β€’ Reduced Dependency on Grid
β€’ Hedge Against Future Tariff Increases
β€’ Increased Asset Value

Industrial units in Sector 63, Ecotech, Surajpur, and Greater Noida Industrial Area are actively switching to rooftop solar.

Prakash Green EnergyΒ provides completeΒ Industrial Solar EPCΒ solutions – We handle everything, including:

βœ” Free Site Survey & Feasibility Study
βœ” Custom System Design & ROI planning
βœ” Structural Analysis
βœ” Government approvals & Net MeteringΒ 
βœ” Installation & Commissioning
βœ” After-Sales Service / Maintenance Support

We specialize in large-capacity rooftop solar systems for factories, warehouses, and manufacturing units. We also provideΒ Residential rooftop solarΒ andΒ Commercial rooftop solar solutions across Noida, Greater Noida, Ghaziabad and Delhi NCR. You can check ourΒ Solar InstallationsΒ here.

πŸ‘‰ Zero Hassle. End-to-End Execution.

Zero Investment / EMI Options

Install Solar Without Heavy Upfront Cost

βœ” Easy EMI Options Available
βœ” Pay from Monthly Savings
βœ” OPEX / RESCO Model (if applicable)

Install solar with almost ZERO upfront Cost β€” and pay from the money you save on electricity.

Solar System Sizes For Industries

Industrial Solar System Sizes We Install

  • 50 kW Solar System

  • 100 kW Solar System

  • 250 kW Solar System

  • 500 kW Solar System

  • 1 MW Solar System

πŸ‘‰ Custom designed based on your connected load & shadow free rooftop area available at your end. For knowing the exact rooftop solar system size, you can:Β 

🏭 Industrial Rooftop Solar Representative Case Study – Industrial Manufacturing Unit in Noida

200 kW Rooftop Solar Installation – Sector 63, Noida

Industry Type: Plastic Manufacturing Unit
Connected Load: 250 kVA
Monthly Electricity Bill (Before Solar): β‚Ή8–10 Lakhs
Available Rooftop Area: 18,000 sq. ft.

πŸ“Š System Details

β€’ Installed Capacity: 200 kW
β€’ On-Grid Net Metering System
β€’ High-Efficiency Mono PERC Solar Panels
β€’ Industrial-Grade Inverters
β€’ Expected Generation: 22,000–24,000 Units per Month

πŸ’° Financial Impact

β€’ Average Monthly Savings: β‚Ή5–6 Lakhs
β€’ Annual Savings: β‚Ή60–70 Lakhs
β€’ Payback Period: ~3.5 Years
β€’ System Life: 25+ Years

πŸ“ˆ Long-Term Benefit

Over 20 years, the facility is projected to save over β‚Ή10 Crores in electricity costs.

🏒 Result

βœ” Reduced grid dependency
βœ” Stabilized power cost
βœ” Improved ESG positioning
βœ” Increased asset value

πŸ“Œ Note: Every factory’s savings vary based on load and rooftop area.

How Much Can Your Factory Save?

Your potential savings depend on:

β€’ Connected load
β€’ Monthly electricity consumption
β€’ Available rooftop area

Request a FREE feasibility assessment to know your projected ROI.

Industrial Solar Savings Calculator – Noida & Greater Noida

How It WorksΒ 

Your savings depend on:

β€’ Monthly electricity bill
β€’ Available rooftop area
β€’ System size feasibility
β€’ Industrial tariff rate

Simple ROI Estimate Table Projections (For Industrial Units):

Monthly Bill Approx System Size Monthly Savings Annual Savings Payback
β‚Ή0.80 Lakhs 75 kW β‚Ή0.72 Lakhs β‚Ή8.64 Lakhs 3–4 yrs
β‚Ή1.5 Lakhs 125 kW β‚Ή1.30 Lakhs β‚Ή15.60 Lakhs 3–4 yrs
β‚Ή3.50 Lakhs 250 kW β‚Ή3.10 Lakhs β‚Ή37.20 Lakhs 3–4 yrs

Actual savings depend on load profile and site conditions.

Get Custom Industrial Solar Savings Report :

Enter your monthly electricity bill and receive:

βœ” Estimated system size
βœ” Monthly savings
βœ” Payback period
βœ” 25-year projection

Serving Noida, Greater Noida & Ghaziabad Industrial Units.

πŸ”’ Your information remains 100% confidential.

Why Choose Prakash Green Energy?

Local Expertise in Noida & Greater Noida
β€’ End-to-End EPC Execution
β€’ Transparent Cost Structure
β€’ High-Quality Solar Components
β€’ Dedicated Project Supervision

FAQs

Q1. What is the cost of industrial rooftop solar in Noida?

The cost of an industrial rooftop solar system depends on system size and load requirement. Industrial solar systems typically range from 50 kW to 1 MW or more.

Most industrial solar systems recover investment within 3–4 years.

Yes, net metering is available subject to local DISCOM guidelines.

You can save a lot of money every year by adopting industrial rooftop solar for your business, in the following ways:

  • There will be a significant reduction in the monthly electricity bill up to 60-90%, because most of your power demand will be met by the industrial rooftop solar, which has a practically nil operating expenses.
  • You save money in the form of income tax benefit by claiming Accelerated depriciation @40% per year on the cost of your industrial rooftop solar under section 32 of Income tax.

Generally no subsidy is available for Industrial and Commercial Rooftop Solar Systems, but ROI is still very high, due to Accelerated Depriciation benefits available to industries under sec 32 of income tax.

The annual maintenance cost of a Industrial rooftop solar system is very low. It ranges between 1 – 1.5% annually.

Net metering balances day generation.

The actual installation and commissioning take approx. 15–30 days depending on the rooftop solar system size. However, the complete process from the time of order placement till energization of rooftop solar system takes approx. 45 – 60 days’ time depending upon the size of the system.

Convert Your Factory Roof into a Power Generating Asset

Know exactly how much you can save before you invest

Scroll to Top